Skip to content
Coffs Coast Electrical
Drone view over Grafton of the 99.5 kW solar array on the Grafton Library roof

Commercial solar & battery / Mid North Coast · Northern Rivers

Commercial solar, sized on what your site actually uses.

We start with a two-week load study on your switchboard, not your roof area. You see the savings and payback before you decide anything.

SAJ inverters and battery stacks in the Mid Coast Trucks plant room

What most quotes miss

Half your bill isn't the power you used.

On a commercial tariff a large share of what you pay is the demand charge, set by your single highest half-hour of the quarter. A system sized on roof area alone can cut your usage and barely touch it.

Ours is sized to cut both. At Mid Coast Trucks that meant pairing a 95 kW array with a 50 kWh battery to carry the afternoon peak. We design and install from 30 kW up to 1 MW: sheds, schools, factories, depots and council buildings.

Before we quote

Five things we work out first.

The biggest system that fits on the roof is rarely the right one. The load study tells us which one is.
  1. Step 01

    Your load, logged

    A power logger sits on your switchboard for two weeks and records how the site actually uses power.

  2. Step 02

    Self-consumption

    How much of what the system makes you'd use on site. This is the number that decides the payback.

  3. Step 03

    Peaks and demand

    Where your highest half-hours sit, and whether solar alone moves them or a battery is needed.

  4. Step 04

    Export limit

    What the network will let you send back. We design inside it rather than hoping.

  5. Step 05

    Roof and hours

    Space, pitch, orientation and condition, plus your hours, weekends and shutdowns. We walk it.

Two recent systems

What a commercial install looks like, with the numbers.

  • Drone view of the Grafton Library solar array

    Grafton, NSW

    Grafton Library

    System
    99.5 kW
    Panels
    210 × Trina 475 W
    Inverter
    110 kW Sigenergy
    Installed cost
    $115k
    Est. annual benefit
    $52,750
    Est. payback
    2.2 years
    Read the project
  • Drone view down the Mid Coast Trucks roof, nine rows of panels

    Macksville, NSW

    Mid Coast Trucks

    System
    95 kW
    Battery
    50 kWh
    Equipment
    SAJ inverters + battery
    Installed cost
    $116k
    Est. saving
    $3k to $4k a month
    Load study
    2 weeks
    Read the project

Costs are approximate. Savings and payback are our estimates from each site's measured or billed usage; yours come from your own load study.

Every commercial install

What the price covers.

  • 01

    Design from the load study

    Expected generation, self-consumption, savings and payback, written up with the assumptions shown.

  • 02

    Installation by our own crew

    The licensed electricians who quote the job install it. Grafton Library, 99.5 kW, took two weeks on site.

  • 03

    Grid connection and STCs

    We lodge the network application, claim the Small-scale Technology Certificates and take them off the price.

  • 04

    Inspections at one and two years

    Panels, mounting, cabling, isolators, switchboards, inverter and monitoring, with thermal imaging of the key connections.

  • 05

    Battery where it pays

    We model whether storage improves the return. Sometimes it does, sometimes it doesn't, and we say which.

  • 06

    Warranties in writing

    25 years on panels, 10 on inverters and batteries, and 10 years on our workmanship.

Rows of tilted panels across the Grafton Library roof

Finance

Often cash-flow positive from month one.

Many commercial systems finance with no capital outlay. When the monthly repayment sits under the monthly saving, the system pays for itself out of the bill it replaces, and the asset is yours at the end of the term. We show the outright and financed cases side by side.

$0
upfront options through Brighte, subject to approval

Commercial solar questions

What business owners ask us.

The questions we get on almost every commercial job, answered the way we'd answer them on the phone.
How much will solar actually save my business?

It depends on how much power you use during the day, your electricity tariff, the system size and how much of the solar you can use on site. We review your bills and run the two-week load study so the savings figure is based on your real usage, not an average. You see the expected savings and payback before you proceed.

How long until it pays for itself?

In our experience most commercial systems pay back in three to five years. Businesses with high daytime consumption can see it faster. The Grafton Library job is estimated at just over two years because the site runs hard through the day and was replacing an old, underperforming system.

What size system does my business need?

Whatever the load study says. We design around your daytime demand, peak loads, operating hours, roof space and export limit. Bigger isn't the aim. The best return is, and it's often a smaller system than a roof-area quote would give you.

Does a commercial system need a lot of maintenance?

Less than most people expect. Commercial solar is low maintenance, but regular inspections keep it safe and performing. That's why the one-year and two-year inspections, with thermal imaging, are part of every commercial install we do.

How much of the solar will we actually use?

On most commercial sites we design for high self-consumption, because every kilowatt-hour used on site replaces one you'd buy from the grid. The design follows your load profile rather than your roof area.

Can we finance it?

Yes. We work with Brighte for finance. For many sites the monthly repayment sits under the monthly saving. Tell us if you'd rather see it as an outright purchase or financed and we'll show both.

What are the warranties?

Panels carry a 25-year manufacturer warranty. Inverters and batteries carry 10 years. Our workmanship warranty is 10 years.

Where we work

Coffs Harbour and 500 km around it.

Based in Bonville, NSW. Commercial solar across the Mid North Coast and Northern Rivers, from Port Macquarie to Lismore and inland to Armidale.
  • Coffs Harbour
  • Grafton
  • Macksville
  • Nambucca Heads
  • Bellingen
  • Woolgoolga
  • Dorrigo
  • Port Macquarie
  • Kempsey
  • Armidale
  • Lismore
  • Ballina

Free quote

Get a free quote for your site.