Skip to content
Coffs Coast Electrical
Commercial solar installed by Coffs Coast Electrical, the nearest system to Kempsey

Commercial solar / Kempsey

Commercial solar in Kempsey.

Solar and battery systems from 30 kW to 1 MW for Macleay Valley businesses, sized from a two-week load study. We're based in Bonville, 95 km away.

Commercial inverters and battery storage installed by Coffs Coast Electrical

Local to Kempsey

95 km from our Bonville base.

Kempsey sits in the Kempsey Shire Council area, about 1 hour 10 minutes from us by road. We design, install and connect commercial systems here the same way we do on the Coffs Coast: the load study first, then a written proposal with the savings and payback shown, then our own licensed crew on the roof.

Parts of the Macleay are flood-prone, so where the inverter and battery sit matters as much as the panels. It's one of the first things to settle at the site visit.

Essential Energy runs the network across Macleay Valley. We lodge the connection application and handle the paperwork, including the Small-scale Technology Certificates on systems up to 100 kW.

Nearest system we've installed

Our closest commercial job to Kempsey.

Roof-mounted 95 kW solar array on the Mid Coast Trucks workshop in Macksville

Real install, real numbers

Mid Coast Trucks, 95 kW solar and 50 kWh battery

A truck dealership with heavy daytime load. Two weeks of logging first, then a 95 kW roof-mounted array with 50 kWh of battery to carry the afternoon peak.

Read the project

Kempsey questions

What businesses here ask us.

Do you install commercial solar in Kempsey?

Yes. Kempsey is 95 km from our Bonville base, about 1 hour 10 minutes by road, and inside the 500 km we cover for commercial work. The same licensed crew that quotes the job installs it.

Who handles the grid connection in Kempsey?

We do. Essential Energy is the electricity network for Kempsey and the rest of northern NSW. We lodge the connection application, deal with any conditions that come back, and design the system inside the export limit they set.

How do you size a system for a Kempsey business?

From a two-week load study. We fit a power logger to your switchboard, record how the site actually uses power, then design around your daytime demand, peaks, operating hours and roof. You see the savings and payback before you decide.

Is Kempsey too far away for servicing?

No. Every commercial install includes inspections at one and two years, with thermal imaging of the key connections, wherever the site is. It's a short drive from our base.

Also serving South West Rocks, Frederickton, Crescent Head, Smithtown and the wider Macleay Valley.

Free quote

Get a free quote for your Kempsey site.