Real install, real numbers
Mid Coast Trucks, 95 kW solar and 50 kWh battery
A truck dealership with heavy daytime load. Two weeks of logging first, then a 95 kW roof-mounted array with 50 kWh of battery to carry the afternoon peak.
Read the project
Commercial solar / Port Macquarie
Solar and battery systems from 30 kW to 1 MW for Mid North Coast businesses, sized from a two-week load study. We're based in Bonville, 142 km away.

Local to Port Macquarie
Port Macquarie sits in the Port Macquarie-Hastings Council area, about 1 hour 43 minutes from us by road. We design, install and connect commercial systems here the same way we do on the Coffs Coast: the load study first, then a written proposal with the savings and payback shown, then our own licensed crew on the roof.
For sites this far down the coast, the load study, install and follow-up inspections are planned as scheduled trips, so the job runs to a timetable.
Essential Energy runs the network across Mid North Coast. We lodge the connection application and handle the paperwork, including the Small-scale Technology Certificates on systems up to 100 kW.
Nearest system we've installed

Real install, real numbers
A truck dealership with heavy daytime load. Two weeks of logging first, then a 95 kW roof-mounted array with 50 kWh of battery to carry the afternoon peak.
Read the projectPort Macquarie questions
Yes. Port Macquarie is 142 km from our Bonville base, about 1 hour 43 minutes by road, and inside the 500 km we cover for commercial work. The same licensed crew that quotes the job installs it.
We do. Essential Energy is the electricity network for Port Macquarie and the rest of northern NSW. We lodge the connection application, deal with any conditions that come back, and design the system inside the export limit they set.
From a two-week load study. We fit a power logger to your switchboard, record how the site actually uses power, then design around your daytime demand, peaks, operating hours and roof. You see the savings and payback before you decide.
No. Every commercial install includes inspections at one and two years, with thermal imaging of the key connections, wherever the site is. We plan those visits in with other work in the region.
Also serving Wauchope, Lake Cathie, Laurieton, Kempsey and the wider Mid North Coast.